Projects
Descriptions are a summary of work that included protective coatings or corrosion prevention treatment and do not represent all elements of the listed project.
Project | Description |
---|---|
City of Phoenix Specialized Equipment, Piping and Infrastructure Coatings Construction Administration & Inspection Services Arcadis U.S. | Evaluation of Coating Systems; Testing of Existing Coatings for Composition and Physical Properties, Including Lead; Coating Failure Analysis; Specification Review and Document Preparation for Selected Coating Systems; Cost Estimates for Various Coating Options, Including Long-Term Maintenance Programs; Review and Analysis of Protective Coatings of Chemical Containment Systems; Train Staff in Coating Applications, Including Surface Preparation, Application, Chemical; Containment Systems, Regulatory Compliance Requirements, Testing of Coatings; Ability to Work Within Confined Spaces in Conformance With OSHA, Local Laws and Standards; Inspection Services; Aeration Basins: Process Air Piping; Chemical Scrubber: Secondary Containment; Primary Sedimentation Basins: Collectors, Launders, Bridges; Paint Samples, Plant Wide; Transformers; Influent Pump Station Odor Control: Scrubbers, Chemical Storage, Piping and Equipment, Foul Air Duct, Secondary Containment; Headworks Odor Control Foul Air Duct |
City of Glendale West Area Water Reclamation Facility Improvements Arcadis U.S. | Preliminary Treatment Facilities: Fine Screen, Grit Basin, and Grit Classifier; Aeration Facilities: Aeration Basins No. 3 and No. 4, Modifications to Aeration Basins No. 1 and No. 2, Odor Control Covers; Blower Facilities: Blower No. 3; Secondary Facilities: Secondary Sedimentation Basins 4, 5 and 6, Odor Control Covers; RAS/WAS Pump Station: RAS Pumps, Scum/WAS Pumps, Modifications to the Existing RAS Pumps; Filtration Facilities: Filters No. 5, No. 6, No. 7 and No. 8, Bypass Channel and Piping, Canopy; Backwash Equalization Basin/Pump Station: Backwash Equalization Tank Expansion, Additional Backwash Waste Pump; UV Disinfection Facilities: Additional UV Modules and Isolation Sluice Gate; Chemical Facilities: Chemical Storage Tanks, Chemical Feed Pumps, Sodium Bisulfite Storage and Feed System, Sampling Systems; Reclaimed Water Pump Station: Non-Potable Water Pumps and New River Agua Fria Underground Storage Project (NAUSP) Recharge Pumps and Piping to the Agua Fria Outfall and to the NAUSP Outlet Structure; Odor Control Facilities: Carbon Adsorber No. 4, Exhaust Fan, Canopy; Administration/Laboratory Building Improvements; Operations and Maintenance Building Improvements; Raw Sewage Pump Station: Raw Sewage Pumps, Channel Grinder, Standby Generator; Airport Lift Station: Lift Station Improvements, Odor Control System, and Forcemain |
City of Austin Water Utility Govalle Tunnel System Rehabilitation and Improvements The Arizpe Group, Inc. | Arcadis U.S. | (5) Sites – Rehabilitate Junction Box, Concrete Access, Drop, and Flume Shafts and Lateral Tunnel; The Shaft and Lateral Rehabilitation Work Includes:; Surface Preparation ; Concrete and Reinforced Steel Repair; Protective Coating System; Related and Ancillary Work; Hazardous Locations and Hazardous Area Monitoring; Safe and Healthful Working Conditions; Tunnel Access Requirements; Temporary Flow Management System; Manned Entry Closed Circuit TV; Cleaning; Fiberglass Shaft Access Covers |
City of Phoenix Tal Wi Wi Ranch Water Tank Black & Veatch Corporation | Inspection of Coating System, 10,000 Gallon Steel Tank Limited Visual Inspection of Tank Interior from Tank Top Access Manhole |
City of Phoenix 91st Avenue Wastewater Treatment Plant – Unified Plant 2005 Project A Black & Veatch Corporation | Effluent Conveyance Piping; Chlorine Disinfection Improvements; Unified Pumping Station; Sludge Thickening Facilities; Effluent Force Main. Services: Shop Coating Inspection; Special Plant Coating Inspection; Warranty; Resident Services; Minor Changes, Change Order Requests, and Change Orders; Substantial Completion and Final Completion Inspection; Project Management; Perform Site Visits/Office Engineering Coordination; Preconstruction Conferences; Project Documentation; Review Shop Drawings and Test Results; Issue Interpretations and Clarifications. Vertical Lineshaft Pumps (Wastewater), Secondary Effluent: (2) 42” Discharge 27,800 GPM, (1) 60” Discharge 76,400 GPM. Retaining Wall; 60” and 42” Steel Pipe; Ductile Iron Pipe Centrifuge #3; Pipe Shop Prime Coat; Electrical and Generator Building; 84” Hobas Pipe ; CMU Site Wall ; Decant Manhole; Pipe Sleeves; Steel Gate Covers; Polymer Pipe |
City of Phoenix Val Vista Water Treatment Plant – GAC Implementation Black & Veatch Corporation | Post-Filter, Granular-Activated Carbon; Vinyl Ester Lining Corrosion Protection System: Sodium Chlorite Bulk Storage Containment Area; Truck Unloading Area and Sump; Platform Structure; Chlorine Dioxide Building; Vertical Lineshaft Pumps: (7) GAC Contactor Supply Pumps, (2) GAC Contactor Backwash Pumps |
City of Phoenix 91st Avenue Wastewater Treatment Plant – Support Systems Upgrades Brown and Caldwell | New Digester Gas Conveyance Piping, Valves, and Supports, Connecting Digester Nos. 1 – No. 16; Boiler Building No. 1 and Boiler Building No. 2., Steel Support Structures; New Boiler Building No.2; Modifications to Boiler Building No.1, New Piping, Relocation of Equipment, New Gas Booster Room; Replacement of Piping, Valves, Flow Meters, Level Detectors, and Appurtenances at Digesters No. 1 – No. 15; Modifications to Control Buildings No. 1 – No. 6, replacement of pump motors; New Standby Power Generator Room with a New Standby Generator and Diesel Fuel Storage Tank |
City of Phoenix 91st Avenue Wastewater Treatment Plant – Solids Thickening Facilities Brown and Caldwell | New Solids Thickening Facility (STF), Sludge Pumps, Sludge Wet Wells, Sprinkler System for Basement, Centrate Piping, Centrifuge Platforms, Odor Ductwork, 25-Ton Bridge Crane; Modifications to Existing Waste Activated Sludge (WAS) Splitter Box, New WAS Conveyance Piping to WAS Pump Station, Overflow Piping to STF; Modifications to Existing Polymer Storage Building, New Sprinkler System, Modifications to Storage Tanks and Mixing Pumps, Non-Skid Coating on Floors, New Polymer Blending Units; Conversion of Existing Thickener Effluent Pump Station to Centrate Pump Station Including Coating of Concrete Surfaces, Foul Air Ductwork, Piping Modifications; New Solids Thickening Facility (STF) Odor Scrubber Including Two-Stage Scrubber, Recirculation and Chemical Metering Pumps, Solution Blow Down Pump Station, Foul Air Ductwork, and Connections to Existing Chemical Storage Tanks; Auxiliary Switchgear Building 3G |
City of Mesa Southeast Water Reclamation Plant Modifications Brown and Caldwell | (1) Manhole Rehabilitation City of Mesa MAG Specifications |
City of Phoenix 23rd Avenue Wastewater Treatment Plant – Sodium Bisulfate Dechlorination Facility C. J. Cameron & Company, Inc. | Epoxy Lining Corrosion Protection System: Sodium Bisulfate Bulk Storage Containment Area, Feed Area, Unloading Area CPVC Chemical Piping Secondary Containment: Fiberglass Reinforced Coating |
City of Sedona Wastewater Reclamation Plant – A+ Upgrades Carollo Engineers, Inc. | Secondary Clarifier: 55′ Dia. Clarifier Equipment consisting of Rake Arm (Steel), Feedwell (Steel), Walkway & Platform (Hot Dip Galvanized) Shop Coating, Final Inspection |
City of Phoenix Val Vista Water Treatment Plant – Modifications and Improvements Carollo Engineers | Protective Corrosion Lining and Bridging System: Caustic Storage Area, Feed Pump Room, Delivery Sump; Acid Storage Area, Feed Pump Room, Delivery Sump; Alum Storage, Feed Pump Room, Delivery Sump; Chlorine Scrubber Containment; Fluoride Storage, Feed Pump Room; Secondary Containment: Fiberglass Reinforced Coating |
City of Phoenix 23rd Avenue Wastewater Treatment Plant – Support System and Process Control Improvements CDM Smith | Chlorine Contact Basins Pressure Grouting Cracks and Leaks in Walls and Floors Remove Existing Joint Sealant in Expansion Joints, Install New Joint Sealant RAS Splitter Structure |
Maricopa County Bethany Home Outfall CDM Smith | (19) 24″ x 20′ Steel Pipe Sections Jack and Bore |
City of El Mirage Water Production Facilities City of El Mirage | 1 MG Water Storage Reservoir for Dietz Crane 2 MG Water Storage Reservoir for Canterbury Drive .5 MG Water Storage Reservoir for Alto Site #1, .75 MG Water Storage Reservoir for Alto Site #2 |
City of Phoenix Coatings Inspection Service City of Phoenix | Inspect Surface Prior To Preparation by Contracted Painting Company Inspect the Contractor’s Preparation Work for Completeness and Conformance to Specifications Inspect Newly Coated Surfaces for Coverage and Possible Defects Report Deficiencies to The Painting Contractor and To the City of Phoenix Project Manager Inspect Reworked Areas for Final Acceptance and Sign-Off 23rd Ave Wastewater Treatment Plant: Digester No. 1 Exterior Piping; Digester No. 3 Internal Piping; Ferric, Caustic; Chemical Scrubber Containment; Repairs to Influent Pump Station Odor Control Secondary Containment; Odor Scrubber Containment, Chlorine Scrubber Containment; Building No. 51, 55, 35, 38; Nocardia Piping; Sludge Piping; 23rd Ave WWTP – Building 30, 40, Roof, Piping, Door 91st Ave Wastewater Treatment Plant: DAFT Pump Room Piping; Digester 13, 14, 15, Assessment; Solids Handling Facility Piping; Sodium Bisulfite Building Pump Room, Tank Containment; Administration Building Exterior; SPW Piping; (95) Bollards; Touch-up Schwing Pump; P1 Primary Pump Station Floor Drain Improvements; Digester No. 6 Cover Replacement; Digester No. 7 Assessment Deer Valley Water Treatment Plant: Raw Water Pump Station Val Vista Water Treatment Plant: JOC Specification Verde Water Treatment Plant: Sedimentation Basin Collector Coatings, Containment Well Site 281: CMU Wall Efflorescence |
City of Scottsdale Citywide Water Resources Treatment JOC Capital Project Management – OCC201 | Coating Inspection Services: Measurement and Recording Ambient Conditions to Verify Environment is Within Limits; Examination of Pre-Surface Conditions, Verification of Surface Cleanliness, Measurement of Surface Profile; Verification Procedures and Equipment Meet Requirements; Recording Material Batch Numbers, Verification Material Manufacturer and Type is Approved and Within Shelf Life; Recording Amount of Materials Used and Surface Area Covered; Verification Recoat Times Are Within Limits, Inter-Coat Cleanliness, Measurement of Wet & Dry Coating Thickness; Perform Final Inspection, Verify Work Meets Finish Quality Standards, Conduct Testing for Discontinuities, Final Punch List Chaparral Water Treatment Plant: Membrane Filter Basin No. 12 Gainey Ranch Water Reclamation Facility: Deck Sloping And Patching, Wet Wells Booster Pump Station No.124: Hydropneumatic Tank Site 71 Odor Control Improvements: Secondary Containment |
Arizona State University Arizona State University Sun Devil Stadium Core Construction | Neoguard Flooring, Adhesion Tests |
City of Scottsdale Citywide Water Resources Treatment JOC Currier Construction Inc | Wastewater: North Pump Station; Northeast Pump Station; Southeast Pump Station; Southwest Pump Station; Northwest Pump Station; Gainey Ranch Water Reclamation Facility Ductile Iron Piping and Valves: Interior Lining, Exterior Coating; Influent Modifications: Concrete Coating; Odor Control Assessment; Odor Control Secondary Containment: Fiberglass Reinforced Coating; Pig Launcher/Receivers: Interior Lining, Exterior Coating; Screenings Building: Concrete Coating; Wastewater Wet Wells: Concrete Coating; Wastewater Wet Wells Assessment Water: Chaparral Water Treatment Plant; Site 68; Site 74; Site 80 Central Groundwater Treatment Facility 36″ Permeate Header Replacements: Interior Lining; Aeration Basins: Concrete Coating; Air/Vac Valves at GAC Piping: Exterior Coating; Blower Pipe: Exterior Coating; Chemical Facilities Secondary Containment: Fiberglass Reinforced Coating; Flooring: Epoxy, Non-Slip; GAC Basin: Concrete Coating; Hydropneumatic Tank: Interior Lining, Exterior Coating; Membrane Filter Basins 1 – 12: Fiberglass Reinforced Coating; OSHGS Modifications: Concrete Coating; Plate Settlers: Interior Lining; Reservoir Assessment; Steel Piping: Interior Lining, Exterior Coating; Sump: Concrete Coating |
City of Scottsdale NE Pump Back Station Improvements Degan Construction, LLC | Ductile Iron Pipe and Fittings |
City of Phoenix North Gateway Water Reclamation Plant – Phase 1 Residuals Pump Station and Force Mains DSWA | Chemical Resistant Coating: Wet Wells; Diversion Structure; Junction Structure; Manholes Fiberglass Reinforced Coating, Secondary Containment: Odor Control; Chemical Storage Painting: Ductile Iron Pipe and Valves; Equipment; Building |
City of Scottsdale Spent GAC Unloading Platform Gannett Fleming, Inc. | Coating for Sump Interior and Steel Structure: Interior Lining; Exterior Coating |
City of Scottsdale North Pump Station, Pipe Support Remediation Gannett Fleming, Inc. | Pipe Support Modifications |
City of Tempe Johnny G. Martinez Water Treatment Plant – Raw Water Aqueduct Repair Gannett Fleming, Inc. | Liquid Applied Membrane Coating System Concrete Coating |
City of Phoenix 23rd Avenue Wastewater Treatment Plant – Headworks Modifications, Influent Pump Station and Influent Interceptor Upgrade Greeley And Hansen, LLC | Pump Station: Pumps, Piping, Equipment, Foul Air Duct; Screenings Building: CMU, Equipment; Two-Train Odor Control: FRP Scrubber Towers, Chemical Tanks, Foul Air Duct, Recirculation Pumps, Piping and Equipment; Odor Control Secondary Containment, Blow Down Sump; Site Wall and Park Wall; Junction Structures; Manholes |
City of Phoenix Ray Road Reservoir – Rehabilitation and Miscellaneous Repairs HDR Engineering, Inc. | Roof Structural Steel |
Pima County Green Valley Wastewater Treatment Plant – Chemical Feed Facility and Headworks Structures Hunter Contracting Co. | Headworks Influent Channels Grit Collection Tank and Channels Solids Handling Facility Chemical Feed Facility |
City of Goodyear 157th Avenue Water Reclamation Facility – Phase IIB Expansion Package 2 Malcolm Pirnie, Inc. | Headworks Facility; Blower Building; Process Air Piping; Heavy Duty Concrete Topping: Epoxy Mortar Composition Flooring; Chemical Resistant Coating: Aeration Basin Influent Channel and Junction Box; RAS Mixing Box; Parshall Flume Area; Flow Equalization Box; Grit Basin Effluent Channel; Grit Basin Effluent Channel; Grit Basin and Inlet Ramp; Grit Basin Influent Channel; Screening Compactor Sumps; Screen Influent Channel, Effluent Channel, and Screen Channels Intumescent Coating |
City of Phoenix 23rd Avenue Wastewater Treatment Plant – Odor Control Improvements Malcolm Pirnie, Inc. | Chemical Resistant Coating: Aeration Basins Influent Channels Fiberglass Foul Air Duct Steel Structure |
City of Phoenix 91st Avenue Wastewater Treatment Plant – Improvements Projects, Upgrade and Expansion, Odor Control Facilities, Blower Expansion Malcolm Pirnie/Arcadis U.S. | Headworks Improvements: Bar Screens, Grit Influent Channel Improvements; Modifications to Grit and Screenings Handling Facility, Including Addition of Grit Washer, Cyclones, Screw Conveyors and Modifications of Existing Screenings Conveyor; Methanol Feed System, Storage Tanks, Transfer Pumps, Metering Pumps; Additions and Modifications to Solids Handling Facility, Centrifuges, Sludge Cake Pumps, Support Systems; Digester No. 16, Digester Control Building Expansion; Sludge Equalization System Improvements; Odor Control System at Solids Handling Facility; Improvements to Support Facilities, Chlorination, Dechlorination, Plant Air, Potable Water, Reuse Water; Expansion of existing Chemical Facility; Addition of Primary Sedimentation Basins, Primary Sludge Pumps, Primary Effluent Splitter Structure; Blower Facility, Installation of Blowers; Modifications to Existing Blower Facility; Modifications to Existing Grit Basins, Pump Station Modifications, Collector Modifications and Drive Replacement; Grit Basins, Grit Pump Stations, Influent Channels, Aerated Effluent Channels; Odor Control Facilities at Plant Headworks, Covers, Conveyance System, Scrubber Facility; Parshall Flumes; Aeration Basins, IMLR Pump Stations; Circular Secondary Sedimentation Basins, RAS/W AS Pump Station, Scum and Dewatering Pumps, Flow Splitter Structures |
City of Phoenix 91st Avenue Wastewater Treatment Plant – Security Improvements Malcolm Pirnie, Inc. | CMU Site Wall and Guard House |
City of Phoenix 91st Avenue Wastewater Treatment Plant – Unified Plant 2001 Malcolm Pirnie, Inc. | Modifications to the existing Influent Junction Structure; Influent Metering and Sampling Station; Headworks Facility Channels; Influent Metering and Sampling Station; Headworks Facility, including Screenings Building, Grit Collection System and Residual Handling Facility; Two Primary Sedimentation Basins and a Primary Sludge Pump Station; Two Aeration Basins, including two IMLR Pump Stations and a Dewatering Pump Station; One Blower Facility; Two Secondary Sedimentation Basins and a RAS/WAS Pump Station; Modifications to Existing Headworks: Odor Control Facility, including Two-Stage Scrubbers, Recirculation Pumps, Scrubber Blowdown Pump Station, and Foul Air Conveyance System; Modification to the Existing Chlorination Facility, Existing Solids Thickening Facilities, Existing Polymer Building, Existing Solids Handling Facility; Auxiliary Switchgear Building No. 4, Primary and Secondary Generator Building, Reuse Water Pump Station; Centrate Treatment Facility, and modifications to the existing Decant Pump Station No. 1 |
City of Phoenix 99th Avenue Interceptor – Sewer Siphon Structures Improvements Malcolm Pirnie, Inc. | Construct New Walls, Roof, and Benching Corrosion Resistant Lining |
City of Phoenix Standard Specifications Malcolm Pirnie, Inc. | Review and provide recommendations for Division 9, Section 09900 Water Services Department |
City of Glendale Influent Splitter Structure Malcolm Pirnie, Inc. | Chemical Resistant Coating |
City of Glendale West Area Water Reclamation Facility – Expansion Malcolm Pirnie, Inc. | Preliminary Treatment Facilities: Fine Screen, Grit Basin, Grit Classifier; Aeration Facilities: Aeration Basins, Modifications to Existing Aeration Basins, Odor Control Covers; Blower Facilities: Blower; Secondary Facilities: Secondary Sedimentation Basins, Odor Control Covers; RAS/WAS Pump Station: RAS Pumps, Scum/WAS Pumps, Modifications to Existing RAS Pumps; Filtration Facilities: Filters, Bypass Channel, Piping, Canopy; Backwash Equalization Basin/Pump Station: Backwash Equalization Tank Expansion, Additional Backwash Waste Pump; UV Disinfection Facilities: Additional UV modules, Isolation Sluice Gate; Chemical Facilities: Chemical Storage Tanks, Chemical Feed Pumps, Sodium Bisulfite Storage and Feed System, Sampling Systems; Reclaimed Water Pump Station: Non-Potable Water Pumps, New River Agua Fria Underground Storage Project (NAUSP) Recharge Pumps, Piping to Agua Fria Outfall and NAUSP Outlet Structure; Odor Control Facilities: Carbon Adsorber, Exhaust Fan, Canopy; Administration/Laboratory Building Improvements; Operations and Maintenance Building Improvements; Raw Sewage Pump Station: Raw Sewage Pumps, Channel Grinder; Airport Lift Station: Lift Station Improvements, Odor Control System, and Forcemain |
City of Goodyear 157th Avenue Water Reclamation Facility – Reclaimed Reservoir and Booster Project Malcolm Pirnie, Inc. | Secondary Containment: Fiberglass Reinforced Coating Hydropneumatic Tank Ductile Iron Piping |
City of Goodyear Adaman Well Development, Storage, Booster and Pipeline Project Malcolm Pirnie, Inc. | Water Storage Tank Hydropneumatic Tank Well Site Piping and Equipment Canopy |
City of Goodyear Adaman Well Development, Storage, Booster and Pipeline Project Phase 5 Arcadis U.S. | Hydropneumatic Tank Well Site Piping and Equipment Canopy |
City of Phoenix Lake Pleasant Water Treatment Plant Malcolm Pirnie, Inc. | DBO: Black & Veatch – American Water – McCarthy Raw Water Inlet Structure; Raw Water Pump Station; Raw Water Conveyance Piping and Equipment; Ballasted Flocculation Equipment; Ozone Facilities; Filters; GAC Contactors; Ultraviolet (UV) Disinfection; Chemical Storage and Containment Facilities; Chlorine Scrubber; Gravity Thickeners; Backwash Settling Basins; Backwash and Recycle EQ Pumping Stations; Solids Dewatering System; GAC Regeneration Facility; Canopies Secondary Containment: Fiberglass Reinforced Coating; Steel Chemical Storage Tanks; Collectors, Gravity Thickeners; Pumps and Equipment; Steel Piping; Ductile Iron Piping; Structural Steel; Air Scour Blower; Trash Rack; Flow Meters; Bridge Crane |
City of Scottsdale CAP Water Treatment Plant – Expansion, Regulatory Compliance Improvements Malcolm Pirnie, Inc. | GAC Facilities: Diversion Structure; Pump Station Wet Well; Feed Channels; Contactors; Seal Well; Contacted Water Junction Vault; EQ Basin, Backwash Waste Pump Station and Electrical Building; Electrical Building; Perimeter Wall; CTW Valve Vault; Existing Residuals Handling Facility Splitter Box; Microfiltration Facility; Dissolved Air Filtration Facility; Concrete Coating, Piping, Pumps, Structural Steel, Equipment Existing Facilities Painting: Plant I: Operations Building; Chlorination Building; Plaza; Elevator Plant II: Filter Building; South Wall of Filters; West Wall of Filters; Bulk Chemical Shade Structures; Carbon Slurry Shade Structures; Thickened Sludge Shade Structure; Electrical Substation; Parking Shade Structure; Solid Waste Transfer Station:; Building; Building Shade Structure; Operations Building; Operations Shade Structure; Exterior of Perimeter Block Wall Existing Chemical Bulk Storage Containment Area: Fiberglass Reinforced Coating Coagulant Aid Polymer Storage Tank: Interior Lining, Exterior Coating 10 MG Finished Water Reservoir, Splitter Box: Concrete Coating |
City of Surprise Roseview Water Supply Facility – Arsenic Treatment Project Malcolm Pirnie, Inc. | Severn Trent, SORB 33® Systems, (3) Vessels: Shop Coating Assessment Backwash Tank: Interior Lining, Exterior Coating; Shop Coating |
Pima County Regional Wastewater Reclamation Department Ina Road Wastewater Treatment Plant – Primary Clarifier Structural Assessment and Remediation Arcadis U.S. | Conduct Condition Assessment Assess the Condition of Four Existing Primary Clarifiers Inspection will include observations, measurements, notes, and photographs as necessary to document structural and coating deficiencies |
City of Phoenix 91st Avenue Wastewater Treatment Plant – Unified Plant 2005 Project B Malcolm Pirnie, Inc. | Mechanical Bar Screen and Appurtenances; Grit Influent and Effluent Channel, Grit Basin No. 3, Grit Cyclone, Grit Washer; Grit Effluent Collection Structure Modifications to Accommodate One Grit Effluent Channel and One Primary Influent Channel; Primary Sedimentation Basins No. 3 and No. 4., Influent Channel and Influent Splitter Structure; Two Primary Sludge Pumps; Primary Effluent Conduits; Aeration Basins No. 3 and No. 4; Mixed Liquor Channel and Splitter Structure; Process Air Blower; Secondary Sedimentation Basins No. 3 and No. 4.; Return Activated Sludge Pumps, Waste Activated Sludge Pump; Reuse Water Pump; Chlorinator and Ejector for Nocardia Control; Centrate Treatment Process Air Blower Ferric Chloride Storage and Feed Area; Polymer Building, Polymer Storage and Feed Equipment; Two Stage Odor Control System with Foul Air Fan; Ferric Chloride Containment Trench from Ferric Chloride Storage and Feed Area to Application Point; Polymer Containment Trench and Double Containment Polymer Piping from Polymer Building to Application Points; Yard Process and Support Piping |
Sanitation Districts of Los Angeles County Skyline Equestrian Trail Bridge OPC Fabrication | Hot Dip Galvanized Bridge Structure and Guard Rails |
Arizona State University Arizona State University Sun Devil Stadium Improvements Professional Certified Inspection, Inc. | High Performance Coatings West Sideline: Structural Steel Framing; Existing Rakers; Bolted Connections; Welded Connections North End Zone Videoboard: Structural Steel Framing; Bolted Connections; Welded Connections; Shop Coating; Field Coating East Sideline: Structural Steel Framing; Shop Coating |
Sanmina-SCI Non-Destructive Testing on Paint Coating Thickness Sanmina-SCI | B Wide Rib Roof Deck Roof Decking, Galvanized Dry Film Thickness (DFT) Measurements |
Super Radiator Coils Signetix, Inc. | (4) Condenser Housing Units, Aluminum Sheet Metal Coating Inspection per NASA-STD-5008A |
Valley Metro Rail Central Phoenix/East Valley Light Rail Transit Project – Town Lake Bridge Skyline Builders & Restoration, Inc. | Continuous 11-Span, Triangular Steel Truss, 1530 Feet Zinc-Rich Primer, Epoxy Intermediate Coat, Urethane with Clear Coat Finish |
City of Phoenix 91st Avenue Wastewater Treatment Plant – Digester 5 Dome Replacement Stanley Consultants, Inc. | Digester Cover, Fixed Radial Beam, 110 Diameter Existing Seal Trough (Interior) Exterior Surface, Handrail Posts, Appurtenances Interior Lining, Exterior Coating |
City of Phoenix 22nd Avenue Interceptor to Yuma Street Stanley Consultants, Inc. | Junction Structure City of Phoenix MAG Specification, Corrosion Coating of Sanitary Sewer Manholes |
City of Phoenix 23rd Avenue Wastewater Treatment Plant Influent Line Upgrades Phase II – 15th Avenue Stanley Consultants, Inc. | (21) Junction Structures, (35) Manholes: City of Phoenix MAG Specification, Corrosion Coating of Sanitary Sewer Manholes; New Precast with PVC Lined Pipe, Ductile Iron, Pipe, VCP Pipe, HDPE with CIPP |
City of Phoenix Sewer Main Improvements – Broadway Road Stanley Consultants, Inc. | (228) Manholes: City of Phoenix MAG Specification, Corrosion Coating of Sanitary Sewer Manholes; New Precast with PVC Lined Pipe, Ductile Iron, Pipe, VCP Pipe, HDPE with CIPP; Existing Brick Rehabilitation |
City of Phoenix 23rd Avenue Wastewater Treatment Plant – Security Systems Upgrades Stantec Consulting, Inc. | CMU Security Wall: Water Repellant, Masonry Stain; Anti-Graffiti Coating |
City of Phoenix 23rd Avenue Wastewater Treatment Plant – Repaint Headworks Odor Scrubber Water Works Engineers, LLC | Odor Scrubber Tanks, Chemical Tanks, Structures, Equipment, Pumps, Motors, and Piping; New Markers, Signs, Labels, and Identification Devices; Odor Control System Fiberglass, Structural Steel Specification |
Motorola North Indian Bend Wash – GAC Treatment Facility Water Works Engineers, LLC | Liquid Phase Granular Activated Carbon Equipment; (3) Complete, Adsorption Treatment Skids; (2) Down-Flow Adsorption Contactors Per Skid; Process and Sample Piping, Valves, Specialty Valves, and Pipe; Supports; Light Supports; Backflow Preventer Sewer Lift Station: Precast Concrete, Interior Lining, Chemical Resistant Concrete Coatings Chemical Handling Area Secondary Containment: Fiberglass Reinforced Coating |
City of Scottsdale Scottsdale Water Campus Advanced Water Treatment Facility Expansion Water Works Engineers, LLC | Neutralization Pump Station: Chemical Resistant Coatings, CPVC Piping; CIP Neutralization Vault; OPS Building, Electrical Room; OPS Building, Structural Steel; RO Building, Structural Steel, Roof Framing, Roof Decking, Crane Beams, HVAC Duct; RO Building, Structural Steel Connections; RO Building, Interior CMU, Masonry; Chemical Area, Structural Steel, CPVC Piping; Chemical Area, Secondary Containment: Fiberglass Reinforced Coating; Steel Pipe, Shop Primer; Liquid Oxygen Canopy, Structural Steel; Ozone Contactor Canopy, Structural Steel, Galvanized Roof Deck, Piping; Fire Protection Piping; MF Building, MFE and BWW Piping, Pipe Supports; Reuse Blend Vault, PW and RBE Piping; CIP Area, Secondary Containment: Fiberglass Reinforced; Meter Vaults Piping; Blower Room HPA; Threshold Inhibitor Area, Secondary Containment: Fiberglass Reinforced; Liquid Oxygen Canopy, Structural Steel; OSHGS, Secondary Containment: Fiber Filled Coating, Canopy, HVAC Duct; CAP OSHGS, Secondary Containment: Fiberglass Reinforced; Gravity Thickener 3: Hot Dip Galvanized Collector Equipment |
Navajo Tribal Utility Authority, Twin Arrows Water and Wastewater Systems 400,000 Gallon Welded Steel Water Works Engineers, LLC | Welded Steel Water Tank: Interior Lining, Exterior Coating |